City of Brevard | ||||||||||||||||||||||||||||||||||
Brevard, NC | ||||||||||||||||||||||||||||||||||
NA | ||||||||||||||||||||||||||||||||||
McGill Associates, PA | ||||||||||||||||||||||||||||||||||
November, 2003 | ||||||||||||||||||||||||||||||||||
BSI teamed up with Trans Construction of Brevard, NC to construct this project. Trans Construction served as the prime contractor and BSI served as a subcontractor. This project was the first phase of the Brevard Greenway, and the project length was 8,359 LF. The major items performed by our firm included excavation of the trail along U.S. 64 and Hospital Drive, 2,293 LF of 30" curb & gutter, 11 storm drain structures, 1,170 LF of storm drain pipe, and timber frame bridge construction. |
||||||||||||||||||||||||||||||||||